Name: Mr. 本站 Gender: Male
Wedlock: Single Nation: Han
Residence: Guangdong-Qingyuan Age: 28
Location: Guangdong-Dongguan Height: 173cm
Target Locations: Guangdong
Target Positions: Industry/Factories-Industrial Engineer
Industry/Factories-Production Management Clerk
Industry/Factories-Technic Engineer
Target Jobs: Industrial Engineer、 Lean Engineer
Education
2005-09 ~ 2009-07 GuangDong University of Technology Industral Engineering Bachelor Degree
Training
2008-12 ~ 2008-12 Guopei Certificate Internal Quality Auditor Training &Qualification
company name (2011-07 ~ Present)
Company Type: Private Enterprise Company Category: Electrical,Micro-electronics
Job Title: Industrial Engineer Positions: Industrial Engineer
Job Description: : process planning, fixture and equipment planning, prepare process checklist
dard time and capacity evaluation, line balance and prepare SOP for new products
tain the usage of the consumptive material, standard time and capacity
orm line balance and improve process to rise capacity
gn and improve the tools and fixture in the work site
tor the efficiency of the production line, analyze these reasons manpower, machine, material , environment, method, push the relative dept to solve issues
en project planning and push: Auto-machine introduce, production way optimize, manpower and material saving, etc
Career Highlight:
-welding machine introduce: welding process operator saving(16 operators-12 operators=4 operators), line balance rate upgrade from 83% to 91%, solder wire saving 3.2grams, cost of solder wire saving 1.6 yuan RMB for each PCBA.
-packaging production line planning and implement: master carton packaging operator saving, every production line deploy 2 packaging operators for 8 lines, after introduce the new equipment it takes only 5 operator to seal the master carton
cabinet pre-process and final assembly combine: manpower saving include 1 conveyer, 1 visual inspector, 1 loading operator and 1unloading operator(total 4 operators), and saving the usage of bubble bag and partition board
rative plate incoming package improvement: change the package material and simplify package way to reduce pack cost(from 0.13yuan to 0.09yuan RMB) and cut down unpack operation time( saving 12 seconds)
erate with RD to change PCBA process from dispensing process to solder paste process, in order to cut down welding failure rate after wave-soldering. In this case charge of PCBA fixture design and improvement evaluation(repairing welding time 140sec reduce to 70sec,4 repair welding operators cut down to 2 operators)
rding to the small order quantity of the product, study the less humanizing process for small products to reduce the change over loss time(38 operators*30minute-
20 operator*40minutes=340minutes) and improve 8% of the motion effective rate
Reason for Leaving: Not very good economic benifit of the company,little chance to promote both in position and welfare
company name (2009-07 ~ 2011-06)
Company Type: Joint Venture Company Category: Electrical,Micro-electronics
Job Title: Junior Engineer Positions: Industrial Engineer
Job Description: blish and maintain the standard labor time, perform line balance to improve production capacity
capacity assessment: Base on the MPS and the capacity of production line to forecast the workforce requirement
are the cost study report for new products, labor rate evaluate basis on factory operating cost, provide quotation to customer for special process
are the workshop layout and line layout design basis on logistics analysis
arch and develop new packaging method, develop new suppliers for packing material, make order for new packing material and follow up the schedule
with customer complaint and settle products packaging issue, improve packaging method to satisfy customer
Career Highlight:
1. Function test man-machine operation improvement: cooperate with TE to disassemble
and rearrange test item, and modify the way of program display in the monitor, in order
to realize one person simultaneously operate two test machine
2. Line balance improvement: provide the cycle time of each model to set up assemble line speed, and upgrade the line balance rate to 80% above for all model
Reason for Leaving: Not a very good department to pratice and learn IE skill,seek more chance to enhance myself