IE工程师英文简历模板

文书君 人气:2.65W

Name: Mr. 本站 Gender: Male

IE工程师英文简历模板

Wedlock: Single Nation: Han

Residence: Guangdong-Qingyuan Age: 28

Location: Guangdong-Dongguan Height: 173cm

Target Locations: Guangdong

Target Positions: Industry/Factories-Industrial Engineer

Industry/Factories-Production Management Clerk

Industry/Factories-Technic Engineer

Target Jobs: Industrial Engineer、 Lean Engineer

Education

2005-09 ~ 2009-07 GuangDong University of Technology Industral Engineering Bachelor Degree

Training

2008-12 ~ 2008-12 Guopei Certificate Internal Quality Auditor Training &Qualification

company name (2011-07 ~ Present)

Company Type: Private Enterprise Company Category: Electrical,Micro-electronics

Job Title: Industrial Engineer Positions: Industrial Engineer

Job Description: : process planning, fixture and equipment planning, prepare process checklist

dard time and capacity evaluation, line balance and prepare SOP for new products

tain the usage of the consumptive material, standard time and capacity

orm line balance and improve process to rise capacity

gn and improve the tools and fixture in the work site

tor the efficiency of the production line, analyze these reasons manpower, machine, material , environment, method, push the relative dept to solve issues

en project planning and push: Auto-machine introduce, production way optimize, manpower and material saving, etc

Career Highlight:

-welding machine introduce: welding process operator saving(16 operators-12 operators=4 operators), line balance rate upgrade from 83% to 91%, solder wire saving 3.2grams, cost of solder wire saving 1.6 yuan RMB for each PCBA.

-packaging production line planning and implement: master carton packaging operator saving, every production line deploy 2 packaging operators for 8 lines, after introduce the new equipment it takes only 5 operator to seal the master carton

cabinet pre-process and final assembly combine: manpower saving include 1 conveyer, 1 visual inspector, 1 loading operator and 1unloading operator(total 4 operators), and saving the usage of bubble bag and partition board

rative plate incoming package improvement: change the package material and simplify package way to reduce pack cost(from 0.13yuan to 0.09yuan RMB) and cut down unpack operation time( saving 12 seconds)

erate with RD to change PCBA process from dispensing process to solder paste process, in order to cut down welding failure rate after wave-soldering. In this case charge of PCBA fixture design and improvement evaluation(repairing welding time 140sec reduce to 70sec,4 repair welding operators cut down to 2 operators)

rding to the small order quantity of the product, study the less humanizing process for small products to reduce the change over loss time(38 operators*30minute-

20 operator*40minutes=340minutes) and improve 8% of the motion effective rate

Reason for Leaving: Not very good economic benifit of the company,little chance to promote both in position and welfare

company name (2009-07 ~ 2011-06)

Company Type: Joint Venture Company Category: Electrical,Micro-electronics

Job Title: Junior Engineer Positions: Industrial Engineer

Job Description: blish and maintain the standard labor time, perform line balance to improve production capacity

capacity assessment: Base on the MPS and the capacity of production line to forecast the workforce requirement

are the cost study report for new products, labor rate evaluate basis on factory operating cost, provide quotation to customer for special process

are the workshop layout and line layout design basis on logistics analysis

arch and develop new packaging method, develop new suppliers for packing material, make order for new packing material and follow up the schedule

with customer complaint and settle products packaging issue, improve packaging method to satisfy customer

Career Highlight:

1. Function test man-machine operation improvement: cooperate with TE to disassemble

and rearrange test item, and modify the way of program display in the monitor, in order

to realize one person simultaneously operate two test machine

2. Line balance improvement: provide the cycle time of each model to set up assemble line speed, and upgrade the line balance rate to 80% above for all model

Reason for Leaving: Not a very good department to pratice and learn IE skill,seek more chance to enhance myself